Laserfiche WebLink
� <br />�d Cable <br />INSTALLATION INSTRUCTIONS <br />1 Uncrate and inspect for damage <br />2. Position pounce pattem on wall per elevation drawing and drill holes that per Ihe ones on pattem. <br />3 Attach to wall per mounting chart. <br />4. Bectrical: <br />Connect the secondary wires from fetters according to layout provided <br />Connect primary wires from power supply to circuit provided. <br />Installation of all wiring and electrical connectlons must conform to NEC requirements and <br />applicable local codes. All connections must be made by a person qualifed by local code <br />requirements. <br />Sign and structural must be properly grounded per requirements of NEC and local code <br />requirements. <br />Do not test light using service truck generator. <br />5. Test light the sign and clean site of all installation debris. <br />ELECTRICAL: <br />Agilight 60W Power Supply <br />CIRCUIT LOAD: 20AMP <br />TOTAL CONN LOAD: VARIES <br />EACH POWER SUPPLY=1.OAmp <br />TOTAL CIRCUIT REQ'D-Depentls on load <br />Monting Hardware Chart <br />� <br />o a <br />� o � <br />� � � <br />1/4" Bolts Thru Wall X X X <br />1/4" Lags W/Shields X <br />1/4" Lag Bolts X <br />1/4" To le Bolts X <br />60W Power Supply � � nuvv rower auppiy <br />Typical Wiring <br />io�zoii !ff pqjrlSON <br />SIGN GROUP, INC. <br />M Chevrolet Signature <br />