Laserfiche WebLink
� <br />� <br />����'� �� �� �ERMf� <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />Date: 6/7/2013 <br />Public Works Permif �: PW1306-007 <br />Building Permit #; <br />Planning Reierence #: <br />Public Works Fee $: $ 25.00 <br />Other $: <br />OWNER NAME AND ADDR�SS: APPLICAPJT NAME AIVD ADDRESS: <br />BILLY AND NONA BRUCE NONA BRUCE <br />1918 SUMMIT AVE SAME <br />EVERETT Wq 9820� <br />PHONE: 4252579215 PHONE: 4252579215 <br />TAX PARCEL ID # SITE ADDRESS: 1918 SUMMIT AVE <br />DESCRIPTION OF PROPOSED WOfZK: <br />PUT A CONCRETE PATH BETWEEN THE CURB AND SIDEWALK <br />(6/7/2013 8:39 AM BES) <br />PUT A CQNCRETE PATH BETWEEN Tf-IE SIDEWALK AND THE CURB FGR A WHEELCHAIR ACC�SS �TO PARKING <br />F'tKlVlll GUNUITIC�NS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4. CONSTRUCT PER CITY Sl-ANDARDS. � <br />5. CALL THE CITY OF EVERETT INSPECTOR RANDY ALLEN 425-339-7403 PRIOR TO STARTING WORK...� : ' <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public property damaged thereby. <br />�����i� �/�>��- C� �� �a�l � <br />Signature of Applicani <br />Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CI7Y UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />