Laserfiche WebLink
ECTION REPORT <br />16 e,..tCI5"�0� <br />m m <br />cda. <br />Anty� 'VI <br />Site Address:�v <br />❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FOR T. ❑ CORRECTION REQUESTED ❑ <br />❑ O C.O. ❑ VIOLATION <br />UNABLE TO PERFORM INSPECTION: <br />❑ CALL (425) 257-8881 FOR REINSPECTION - 24 hour notice required <br />- j 19 A <br />to id AL el <br />Inspector. Date: <br />EIR (4/09) )CSiciv aTe[,c_ .111 <br />x I'k-.-uIONS • 42,, u.. mnm <br />TYPE OF INSPECTION REQUESTED <br />ELECTRICALDI <br />" <br />MECHANICAL <br />PLUMBING <br />❑ Temp Service <br />ER ground <br />❑ Groundwork/Slab <br />❑ Groundwork/Slab <br />❑ Groundwork <br />0 Footing <br />❑ Rough In <br />❑ Rough In <br />❑ Slab/Conduit <br />❑ Foundation <br />❑ Ceiling Grid <br />❑ Ceiling Grid <br />❑ Rough In <br />❑ Structural Slab <br />❑ OK to insulate <br />❑ OK to insulate <br />❑ Service <br />❑ Framing <br />❑ Rooftop Units <br />❑ Water Service <br />❑ Grounding <br />❑ Insulation <br />❑ Mechanical Final <br />❑ Medical Gas <br />❑ Ceiling Grid <br />❑ Drywall Nailing <br />❑ Plumbing Final <br />❑ Electrical Final <br />❑ Shear Nailing <br />GAS PIPE <br />SITE WORK <br />❑ Roof Nailing <br />❑ Rough In/Service <br />Hot Water Tank <br />❑ Footing drains <br />❑ Ceiling Grid <br />❑ Refrigeration <br />❑ Rough In <br />❑ Roof drains <br />❑ Building Final <br />EJ Ga Final <br />❑lHHsWT�Final <br />OR CONSULTATION: <br />' <br />11WOTHER <br />�? <br />1=7\ Gf/G/� <br />❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FOR T. ❑ CORRECTION REQUESTED ❑ <br />❑ O C.O. ❑ VIOLATION <br />UNABLE TO PERFORM INSPECTION: <br />❑ CALL (425) 257-8881 FOR REINSPECTION - 24 hour notice required <br />- j 19 A <br />to id AL el <br />Inspector. Date: <br />EIR (4/09) )CSiciv aTe[,c_ .111 <br />x I'k-.-uIONS • 42,, u.. mnm <br />