Laserfiche WebLink
general population/uncontro►led exposure of 1.0 mW/cm2 as referenced in Table <br />i OET Builetin 65 Appendix A. <br />ENVIRONMENTAL EVALUATION <br />Routine environmental evaluation is required if a PCS broadband facility with <br />building mounted antennas has a total power of all channels in any given sector <br />greater than 2,OOOW ERP as referenced in "Table 2 Transmitters, Facilities <br />and Operations subject to Routine environmental Evaluation" of Builetin <br />65. For the proposed facility, the total power in any given sector is less than <br />2,OOOW ERP therefore the WCF is categorically exempt from requirement for <br />routine environmental processing. <br />FCC C4MPLIANCE <br />The general population/uncontrolled exposure near the building, inc(uding <br />persons at ground level, surrounding properties, inside and on existing structures <br />will have RF exposure much lower than the "worst case" scenario, which is a <br />small fraction of the MPE limit. <br />Only trained persons will be al(owed to access the rooftop for maintenance <br />operations. T-Mobile and/or its contractors will provide training to make the <br />employees fu(ly aware of the potential for RF exposure occupational training and <br />they can exercise control over their exposure that is within the <br />occupational/controlled limits. <br />CONCLUSIONS <br />Based on calculations, the proposed WCF will comply with current FCC and <br />county guidelines for human exposure to radiofrequency electromagnetic fields. <br />All representations contained herein are true to the best of my knowledge. <br />.��t�it=��� <br />• MPE Calculations <br />. <br />. <br />Antenna Product Data Sheets <br />WCF Lacation Map <br />