Laserfiche WebLink
I-``�,�� <br />�'t �'`' ' c� C 1�-1-C <br />����� <br />�� <br />_ _ - - - <br />14636 NE 9�`�' Street - Redmond. WA 980�2 - www.TelcoPaci�c.com <br />June 14, 2013 <br />City of Everett <br />Building Services <br />3200 Cedar Street <br />Everett, WA 98201 <br />RE: T-Mobile building permit application <br />SE01510A, Do�vntown Everett —`Vall St. Buildinb <br />Address: 2930 Wetmore Avenue, Everett, WA 98201 <br />Relocate rooftop antennas to penthouse fa�ade, add <br />additional equipment <br />Construction value: $45,000.00 <br />Dear City of Everett: <br />On behalf of T-Mobile, please tinci attached the required documentation foi- a buildin;,� <br />pennit application for this project. <br />Proposed P►•oject: <br />T-Mobile maintains an e�istin�; �vireless facility located at 2930 Wetmore Avenue, <br />Everett, ��here the antennas are located on the top of the rooftop penthouse. The <br />praposed project consists of moving the antennas from the top of the rooftop penthouse to <br />the fa�ade of the penthouse, witll the anteiulas flush mounted to the fa4ade. Asso��iated <br />equipment (RRU's, dipleYers, TMA's) will be located adjacent to the antennas. All <br />antennas and equipment will be painted to inatch to blend in with the building. The <br />existing radio cabinets on the roof will remain. <br />Submittal Documentation: <br />1. Check in the �motmt of $�93.25 to submittal fees for a valuation of <br />$45,000.00; <br />2. Four (4) set of construction drawings, 11" x 17" and foLir (4) sets of <br />construction drawing, 24" x 3G'; <br />3. T�vo (2) sets of structural calculations for thc proposed project, Cornerstone <br />Engineeri�lg, Rev. 1, dated April 30, 2013; <br />4. T�vo (2) sets of NIER reports, prepared by BJ Thomas, dated June 6, 2013; <br />1�2 <br />