My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1904 113TH PL SE 2017-01-13
>
Address Records
>
113TH PL SE
>
1904
>
1904 113TH PL SE 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 9:42:12 PM
Creation date
12/22/2016 11:17:47 AM
Metadata
Fields
Template:
Address Document
Street Name
113TH PL SE
Street Number
1904
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />;:;.;. <br />s;��,>. <br />; � . <br />a,,. <br />,:�;;, <br />..-=�::(g, <br />. t <br />June 3, 2015 <br />ES-3�88.01 <br />t` ^"_�..��; � �Y� � =i <br />'.� *,�;y� .A,�.,� <br />`. i <br />r <br />Earth Solutions NW ��c <br />° Gi>;�tec ��n c�;l En:;ine:�riri!� <br />` (..�;n.titn:��n�;n r�-{i;nitori*t:; <br />m E!���ir ,r„nc.,nt,?I �: ir.,,i F,:,. <br />Polygon NW <br />PO Box 1349 <br />Bellevue, Washington 98009 <br />Attention: Mr. Eddy Stevens <br />Subject: Final Report <br />Building 5, Lots 5.1 thru 5.7 <br />Building 6, Lots 6.1 thru 6.4 <br />Building 20, Lots 20.1 thru 20.8 <br />Construction Monitoring and Consulting Services <br />Silver Lake Center <br />Builcfing 5-1904 thru 1928 — 113th Place Southeast <br />Bui{ding 6- 1919 thru 1929 — 113th Place Southeast <br />Building 20 - 11002 thru 11016 — 20t" Drive Southeast <br />Everett, Washington <br />Dear Mr. Stevens: <br />In accordance with your request, Earth Solutions NW, LLC (ESNW) provided construction <br />monitoring and consulting services at the subject site. Our services included providing onsite <br />observations and festing on a part-time from January 26 to April 3, 2015. Our representatives <br />made 11 site visits to observe building foundation subgrade and test building slab backfill. <br />Our representative observed building foundation subgrade to be dense and suitable for support <br />of the proposed structures. <br />Our representative conducted 50 field density tests in accordance with ASTM Test Designation <br />D2922 (Nuclear Gauge Method). Three representative soil samples were returned to our <br />laboratory for analysis of the maximum dry density and optimum moisture content in <br />accordance with ASTM D1557-02 (Modified Proctor). Density test results indicate adequate <br />compaction of at least 95 percent at the tested locations of the building slab backfill. <br />Based on our observations and testing, the earthwork construction was accomplished in <br />accordance with the project plans and our geotechnical recommendations. <br />I�G_� i 36th f'i<�c'e ti E., auc�� 2l? i:i;r. t�^s;; !i> ?`.i g!'i �. �i�1 �_.'„z,4 • F;`,X t11:�! �: � 1-471 � <br />�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.