My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1923 113TH PL SE 2017-01-13
>
Address Records
>
113TH PL SE
>
1923
>
1923 113TH PL SE 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 9:51:59 PM
Creation date
12/22/2016 1:26:38 PM
Metadata
Fields
Template:
Address Document
Street Name
113TH PL SE
Street Number
1923
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />June 3, 20�5 <br />ES-3588.01 <br />� Eartl� . <br />`Sotufiori's; <br />NW«< ' <br />Earth Solutions NW LLC <br />• Gentec'rmir_al Engineering <br />° C�>nstruction +Viunitoring <br />� L'ivirc�nrnenl.al Sri�nces <br />Polygon NW <br />PO Box 1349 <br />Bellevue, Washington 98009 <br />Attention: Mr. Eddy Stevens <br />Subject: Final Report <br />Buiiding 5, Lots 5.1 thru 5.7 <br />Bui{ding 6, Lots 6.1 thru 6.4 <br />Building 20, Lots 20.1 thru 20.8 <br />Construction Monitoring and Consulting Services <br />Silver Lake Center <br />Building 5-1904 thru 1928 —113th Place Southeast <br />Building 6- 1919 thru 1929 — 113t" Place Southeast <br />Building 20 - 11042 thru 110'f6 — 20t" Drive Southeast <br />Everett, Washington <br />Dear Mr. Stevens: <br />In accordance with your request, Earth Solutions NW, LLC (ESNW) provided construction <br />manitoring and consulting services at the subject site. Our services included providing onsite <br />observations and testing on a part-time from January 26 to April 3, 2015. Our representatives <br />made 11 site visits to observe building foundation subgrade and test building slab backfill. <br />Our representative abserved building foundation subgrade to be dense and suitable for support <br />of the proposed structures. <br />Our representative conducted 50 field density tests in accordance with ASTM Test Designation <br />D2922 (Nuclear Gauge Method). Three representative soil samples were returned to our <br />laboratory for analysis of the maximum dry density and optimum moisture content in <br />accordance with ASTM D1557-02 (Modified Proc#or). Density test results indicate adequate <br />compaction of at least 95 percent at the tested locations of the buifding slab backfilf. <br />Based on our observations and testing, the earthwork construction was accomplished in <br />accordance with the project plans and our geotechnical recommendations. <br />I;'OS -"13f,t'i PI�aCe �d.E., Suile 2;)'1 > I;e;;t:��:ue, V1'�i )8C1U5 " i4251 44i)-4704 • FP,X (425) !'{9-4; 1"i <br />C� <br />
The URL can be used to link to this page
Your browser does not support the video tag.