Laserfiche WebLink
��NA� <br />4 <br />, �� <br />W � x <br />n � <br />i ? <br />�G ¢y. <br /><TNc ENG`N�g <br />Eddy Stevens <br />5ilverlake Center, LLC <br />P.O. Box 1349 <br />Beilevue, WA 98009 <br />CIVIL. iiNGWFE:fiWG. I_4ND f'UINNIPJG, ;iUFNEYW(i <br />May 19, 2016 <br />Eddy.stevens@ Polygonhomes.com <br />RE: Final Letter for Building 4 <br />Silverlake Center <br />2001, 2003, 2005, 2007, & 2009 - 113th PI SE, Everett, Washington <br />Our Job No. 19780 <br />Based on our periodic inspections, it appears that the Interior and Exterior Shear, Frame, Building Wrap, <br />Window Wrap, Lateral Bracing, Roof and Exterior Final for Buiiding 4 at Silverlake Center is in substantiai <br />compliance with RCW 64.55 and is in substantiai compliance with the approved drawings (based on <br />plans prepared by Milbrandt Architects dated February 4, 2015). <br />If you have any questions or need additional information, please contact me at this office. Thank you. <br />Respectfully, <br />��" ,,..,.._----- ". <br />I P. Grubb, P.E. <br />Director of Engineering Services <br />HPG/ns <br />19780c.024.doc <br />cc: Ron Smith, Polygon Homes <br />Jeff Jacobsen, Polygon Homes (via email) <br />Thomas Heinz, Polygon Homes (via email) <br />Micheile Dittman, Polygon Ffomes (via email) <br />Frank Mellas, Sound Inspections, LLC (via email) <br />Nancy Scott, Barghausen Consulting Engineers, Inc. <br />��, P GR�e� <br />�� 04 ��,�sp�E� <br />� <br />'` i <br />� <br />� �' �' � <br />�k , 23975 . � <br />�'�s, , ��'tsrti.�t���r- <br />S�q:\':� L �'• � <br />182"15 72ND AVENUE SOUTH KENT, WA 98032 (425) 251-G22?_ (425) 251-8782 FAX <br />BRANCH QFFICES • TUMWATER, WA • LONG BEACH, CA • ROSEVILLE, CA • SAN DIEGO, CA <br />www.barghausen.com <br />