Laserfiche WebLink
CERTIFICATE OF COMPLETION <br /> Project: 2016 Biosolids Disposal <br /> Contractor: Karl Needham Enterprises <br /> Work Order No. 2600F <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> '110 <br /> �" <br /> Public W 6 ks Director Date <br /> Dave Davis <br /> Approved by: <br /> • <br /> _tel 17414/Leib <br /> Mayor, l fi, of Ever' Date <br /> Ray Ste .�I. • <br /> Atte- • ph v%ft <br /> City C erk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: b_ <br /> im Iles, City Attorney <br /> 12/111` <br /> Date <br />