My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/12/14 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/12/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 9:21:58 AM
Creation date
1/4/2017 9:20:41 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/14/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 10/3/2016 <br /> COST ESTIMATE: GRAND AVENUE PARK BRIDGE-EXTRA WORK <br /> SUPPLEMENT#2 <br /> October 3,2016 Stantec Stantec <br /> GRAND AVENUE PARK BRIDGE - EXTRA <br /> Project Manager Designer CAD Technician <br /> WORK SUPPLEMENT #2 MULTIPLIER: <br /> Item I SCOPE OF WORK $170.00 I $140.00 I $110.00 I 1.0000 <br /> 1 PROJECT MANAGEMENT <br /> Labor Subtotal: 0 0 0 $0 <br /> 2 GEOTECHNICAL ENGINEERING <br /> Labor Subtotal: 0 I 0 I 0 $0 <br /> :'f -s it t'3s j " y ,,i1 `x`70 eab'D T . ,.4 :.. _ <br /> 3 STRUCTURAL ENGINEERING <br /> Labor Subtotal: 0 1 0 0 $0 <br /> _ �� .x �tt'�'i .Asa:Y. �...�.�°,:a:17,40.4- 1-1,- 24 <br /> s T - 2%=____,___-- -— __,,,Ari _ <br /> 4 CIVIL ENGINEERING <br /> Labor Subtotal: 0 I 0 I 0 $0 <br /> 5 ENVIRONMENTAL&PERMITTING <br /> Labor Subtotal: . 0 0 I 0 $0 <br /> 6 ELECTRICAL ENGINEERING <br /> 6.10 Extra Work-Re-design of Park Lighting 6 7 5 $2,550 <br /> 6.20 Extra Work-New design for 4"conduits 10 8 6 $3,480 <br /> Labor Subtotal: 16 I 15 I 11 $6,030 <br /> :y[: .N4: 1„,: c,4t4`; 4.,4; 4' iDuolloO-11171 ,- _ — s*t:. <br /> Labor Sum: 16 15 11 $6,030 <br /> Reimbursable Sum: r --_ $0 <br /> $6,030 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.