My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/12/14 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/12/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 9:21:58 AM
Creation date
1/4/2017 9:20:41 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/14/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Supplemental Agreement No. 3 12/14/16 Briefing COUNCIL BILL# <br /> of Local Agency Standard Proposed Action Originating Department Public Works <br /> Consultant Agreement with 12/21/16 Consent Contact Person Heather Griffin <br /> KPFF Consulting Engineers for Action Phone Number 425-257-7206 <br /> the Grand Avenue Park Bridge First Reading FOR AGENDA OF December 14, 2016 <br /> Construction Management Second Reading December 21, 2016 <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> 16th Street from Grand 12/3/2014 Consultant Supplemental Agreement Public Works <br /> Avenue to West Marine Agreement for Design No. 3 <br /> View Drive 3/23/2016 No Cost Time <br /> Extension <br /> Amount Budgeted $14,800,000.00 <br /> Expenditure Required $1,390,791.35 Account Number(s): <br /> Budget Remaining $11,000,000.00 WO 3588,Fund 336,Fund 303 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Grand Avenue Park Bridge design provides for a utility and pedestrian crossing from Grand Avenue <br /> Park, over a steep slope,Burlington Northern Santa Fe Railroad tracks, State Route 529 (also known as West <br /> Marine View Drive)to the waterfront. <br /> City staff is providing construction inspection for the project.However,additional construction management <br /> services are needed to supplement oversight of the construction in accordance with requirements of the <br /> project's federal funding. Additional funds are included to provide construction engineering support from <br /> the Engineer-of-Record. <br /> RECOMMENDATION: <br /> Authorize the Mayor to sign Supplemental Agreement No. 3 of the Local Agency Standard Consultant <br /> Agreement with KPFF Consulting Engineers for the Grand Avenue Park Bridge construction management <br /> services in an amount not to exceed$1,390,791.35. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.