My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/12/14 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/12/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 9:21:58 AM
Creation date
1/4/2017 9:20:41 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/14/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> Grand Avenue Park Bridge Construction Management and Construction Support <br /> City of Everett Scope of Work <br /> Exhibit A <br /> 22. Project Closeout. Prepare Letters of Substantial (including punch list), Physical, and Final <br /> Completion for Owner approval and signature. Prepare final pay estimate and Final Contract <br /> Voucher Certification for Owner approval and processing. <br /> 23. Final Records. Compile and convey final Project records,transferring to the Owner for <br /> archiving at final acceptance of the Project. Records will consist of hard copy originals and <br /> electronic records on electronic storage medium. <br /> Deliverables <br /> • Monthly Construction Progress Reports <br /> • Schedule Review Comments <br /> • Meeting Agendas and Notes <br /> • Submittal Log <br /> • Record of Materials <br /> • RFI Log <br /> • Change Order(s) <br /> • Progress Pay Requests and Final Contract Voucher Certification <br /> • Letters of Completion <br /> • Final records—hard copy and electronic <br /> • DBE subcontractor monthly monitoring documentation <br /> ▪ ii\e cord Drawings <br /> • Documentation for work performed by Force Account in accordance with Section 1-09.6 <br /> • FHWA Audit Review <br /> E. Construction Phase Services—Field -(Owner and Consultant Staff) <br /> 1. Observe the technical conduct of the construction, including providing day-to-day contact with <br /> the construction contractor, Owner, Client, utilities, and other stakeholders, and monitor for <br /> adherence to the Contract Documents. The Consultant's personnel will act in accordance <br /> with Sections 1-05.1 and 1-05.2 of the WSDOT/APWA Standard Specifications. <br /> 2. Observe material, workmanship, and construction areas for compliance with the Contract <br /> Documents and applicable codes, and notify construction contractor of noncompliance. <br /> Immediately or as soon as possible, advise the Owner and Client of any non-conforming work <br /> observed during site visits. <br /> 3. Consultant field observer to prepare Inspector Daily Reports (IDR's), recording the <br /> construction contractor's operations as actually observed by the Consultant; includes <br /> quantities of work placed that day, contractor's equipment and crews, and other pertinent <br /> information, including any non-conforming work issues or concerns. <br /> 4. Interpret Contract Documents, in coordination with Designer. <br /> 5. Evaluate issues which may arise as to the quality and acceptability of material furnished, <br /> work performed, and rate of progress of work performed by the construction contractor. <br /> Summarize during the weekly meetings. <br /> 6. Establish communications with adjacent property owners. Respond to questions from <br /> property owners and the general public in accordance with the Owners directives and <br /> preferences. Normal communications with general public concerns can be handled by field <br /> staff members. For those issues that may arise from a business owner or citizen that could <br /> be elevated to the City's Public Works Director or Mayor's Office, or could result in a potential <br /> claim issue against the City, then those types of complaints need to be brought to Owner's <br /> Construction Manager's or liaison's attention. <br /> 23 <br /> rr <br />
The URL can be used to link to this page
Your browser does not support the video tag.