My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/12/14 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/12/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 9:21:58 AM
Creation date
1/4/2017 9:20:41 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/14/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T <br /> EXHIBIT G-1 <br /> KBA Construction Management& Observation <br /> CONSULTANT FEE DETERMINATION <br /> SUMMARY OF COST <br /> GRAND AVENUE PARK BRIDGE - CONSTRUCTION MANAGEMENT & CSS <br /> PHASE 1 <br /> Classification Total Hours X Rate = Cost <br /> Principal 17 X $85.32 = $1,450.44 <br /> Project Manager 280 X _ $60.35 = $16,898.00 <br /> Resident Engineer 2832 X $60.85 = $172,327.20 <br /> Office Engineer 1896 X $43.70 = $82,855.20 <br /> Inspector 0 X $47.87 = $0.00 <br /> Project Admin. 0 X $92.76' = $0.00 <br /> Contract Admin. 42 X $52.03 = $2,185.26 <br /> X = $0.00 <br /> ' DSC Subtotal $275,716.10 <br /> Overhead (OH) Cost <br /> OH Rate x DSC of 140.15% X $275,716.10 = $386,416.11 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.00% X $275,716.10 = $82,714.83 <br /> Total KBA Labor Cost $744,847.04 <br /> Reim bursables <br /> Vehicles ($5.75/hour '- tax) $17,668.00 <br /> Supplies, Equipment $726.00 <br /> Subcontract Materials Testing & Consulting, Inc. $85,500.00 <br /> Subtotal $103,894.00 <br /> •Subconsultant Total, 848,7 . <br /> 64 <br /> 38 Tii �Ki,� I�--i' <br /> . LJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.