Laserfiche WebLink
EXHIBIT G-1 <br /> LMN Architects <br /> - - - - CONSULTANT FEE DETERMINATION - - <br /> SUMMARY OF COST <br /> GRAND AVENUE PARK BRIDGE - CONSTRUCTION MANAGEMENT & CSS <br /> PHASE 1 <br /> Classification Total Hours X Rate = Cost <br /> ;Partner 1 10 X $77.881 = $778.80 <br /> 'Project Designer - _- __ 120 X ; $34.86! _ $4,183.20 <br /> !Specs 8 X ' $45.91 ; _ $367.28 <br /> 1 X _ $0.00 <br /> X = $0.00 <br /> X 1 = $0.00 <br /> X = $0.00 <br /> X , = $0.00 <br /> DSC Subtotal $5,329.28 <br /> Overhead (OH) Cost _ <br /> OH Rate x DSC of 185.00% ; X $5,329.28 = $9,859.17 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.00% X $5,329.28 = $1,598.78 <br /> Total LMN Labor Cost $16,787.23 <br /> Reimbursables <br /> I- - <br /> Mileage; (300 Miles x$0.545/mile) $163.50; <br /> , <br /> Subtotal $163.50 <br /> - <br /> ISubconsultant Total: $16,950.73 <br /> 43 7 ��_-_ C <br /> : O <br />