Laserfiche WebLink
iD <br /> EXHIBIT G-1 <br /> Stantec Consulting Services Inc. <br /> CONSULTANT FEE DETERMINATION <br /> SUMMARY OF COST <br /> GRAND AVENUE PARK BRIDGE - CONSTRUCTION MANAGEMENT & CSS <br /> PHASE 9 <br /> Classification Total Hours X Rate = Cost <br /> Project Manager 51 X $170.00 = $8,670.00 <br /> Designer 26 X $142.00` = $3,692.00 <br /> Production 4 X . $98.00 = $392.00 <br /> X = $0.00 <br /> X = $0.00 <br /> X = $0.00 <br /> X = $0.00 <br /> X = $0.00 <br /> DSC Subtotal $12,754.00 <br /> Overhead (OH) Cost <br /> OH Rate x DSC of 0.00% X $12,754.00 = $0.00 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.00% X $12,754.00 = $3,826.20 <br /> Total Stantec Labor Cost $16,580.20 <br /> Reimbursables <br /> Mileage (120 Miles x$0.545/mile) $65A0 <br /> Subtotal $65.40 <br /> Subconsultant Total: $16,645.60 <br /> 45 TI .t_ .- <br />