Laserfiche WebLink
. 3 <br /> EXHIBIT G-1 <br /> HDR <br /> CONSULTANT FEE DETERMINATION <br /> SUMMARY OF COST <br /> GRAND AVENUE PARK BRIDGE - CONSTRUCTION MANAGEMENT& CSS <br /> PHASE 2 <br /> Classification Total Hours X Rate = Cost <br /> Principal 0 X $92.00 = $0.00 <br /> Project Manager 12 X $89.59 = $1,075.08 <br /> Engineer 12 X $42.00 = $504.00 <br /> Controller 4 X $46.76 = $187.04 <br /> X = $0.00 <br /> X = $0.00 <br /> X = $0.00 <br /> X = $0.00 <br /> DSC Subtotal $1,766.12 <br /> Overhead (OH) Cost <br /> OH Rate x DSC of 175.35% X $1,766.12 = $3,096.89 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.00% X $1,766.12 = $529.84 <br /> Total HDR Labor Cost $5,392.85 <br /> Reimbursables <br /> Mileage (367 Miles x $0.545/mile) $200.00 <br /> Subtotal $200.00 <br /> Subconsuitant T•tal: $5,592.85; <br /> 49 c!;c <br /> w[----; flII <br />