My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/12/21 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/12/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 9:59:38 AM
Creation date
1/4/2017 9:57:46 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/21/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET �a <br /> PROJECT TITLE: <br /> Amendment No. 1 to the Briefmg COUNCIL BILL# <br /> Professional Services Proposed Action Originating Department Public Works <br /> Agreement with AECOM for Consent Contact Person Richard Hefti <br /> Design and Construction X Action Phone Number 425-257-7215 <br /> Support Services for the Water First Reading FOR AGENDA OF December 21,2016 <br /> Filtration Plant Operations Second Reading <br /> Building Seismic Retrofit Third Reading <br /> Project Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA .� <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Everett Water Filtration Professional Services Amendment No. 1 Public Works <br /> Plant Agreement <br /> Amount Budgeted $1,000,000 <br /> Expenditure Required $19,000 Account Number(s): UP 3600-1 <br /> Budget Remaining $793,600 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The"Water Filtration Plant Operations Building Seismic Retrofit"project's contract with AECOM is set to <br /> end December 31,2016. The project requires rebidding,which includes updating specifications and plans to <br /> reflect all addenda items,reissuing bidding documents and answering bidders' requests for additional <br /> information. The additional work amounts to $19,000,bringing the total revised compensation for this <br /> contract to $204,400. The time extension provides for a December 31,2017 completion date. <br /> The budget remaining amount is determined by subtracting AECOM's original contract($185,400), less <br /> advertising cost($2,000), and less Amendment No. l's cost($19,000). <br /> RECOMMENDATION: <br /> Authorize the Mayor to sign Amendment No. 1 to the Professional Services Agreement with AECOM for the <br /> Design and Construction Support Services for the Water Filtration Plant Operations Building Seismic <br /> Retrofit project in an amount not to exceed$204,400. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.