Laserfiche WebLink
6 <br /> CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> DATE: September 20, 2016 ADDRESS: 946 Boulder Blvd <br /> CONTRACTOR: American Process Group, Inc. CITY/STATE: Stony Plain AB T7Z 0E6 <br /> PROJECT TITLE: 2016 Biosolids Removal WORK ORDER NO. 2600E <br /> DATE WORK COMPLETE: July 14, 2016 FINAL AMOUNT: $568,779.27 <br /> Exclusive of State Sales Tax <br /> CONTRACTOR'S CERTI FI CAT ION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work <br /> performed and material furnished to the City of Everett, that the same or any part thereof has not been paid, and <br /> that I am authorized to sign for the claimant; that I have not rented or purchased any equipment or materials <br /> from any employee of the City; I further certify that the attached final estimate is a true and correct statement <br /> showing all the monies due me from the City of Everett under this contract; that I have carefully examined said <br /> final estimate and understand the same and that I hereby release the City of Everett from any and all claims of <br /> whatsoever nature which I may have, arising out of the performance of said contract, which are not set forth in <br /> said estimate. <br /> X CPKAA.,--CE ,Colleen Prince X Vice President <br /> CONTRACTOR TITLE <br /> American Process Group, I nc. <br /> Subscribed and savor to) efore me this day of A)0✓V dvl. , 2016 <br /> X '- MAIN STREET LAW LIP <br /> 1/ Barristers&N ofa�=Pref i c <br /> g , residing Cox 3407,115 Main Street 2 Flour <br /> ors <br /> i n and for the�-atm=©f�,la/-ask�i�-t� at <br /> �i�� Spruce Grove,AB TM 3A7 <br /> CYYPHONE:(780)360 a 8100 <br /> TYLER M.PEROZNI <br /> Barrister&SJic ttt <br /> PUBLIC WORKS DEPARTM ENT CERTIFICATION <br /> I Certify the attached final estimate to be <br /> based upon actual measurements and to <br /> be true and correct. APPROVED Date: <br /> X g, & /Jr,/ <br /> Construction Manager Public Works,y o <br /> Tom Fuchs Dave Davis <br /> I NSTRUCTI ONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a cl ai m <br /> attached. <br /> Revised 6/2012 <br /> 34 <br />