My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/12/21 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/12/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 9:59:38 AM
Creation date
1/4/2017 9:57:46 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/21/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Run Date: 9/14/2016 City of Everett-Public Works Department Cutoff Date: 8/26/2016 <br /> Time: 9:45 AM Contract Estimate Voucher <br /> Project: 337 For Work Order#2600E <br /> Contractor; AMERICAN PROCESS GROUP INC <br /> 2016 BIOLSOLDS REMOVAL Estimate#2 946 BOULDER BLVD <br /> WO 2600E BID:$568,779.27 STONY PLAIN,AB,CANADA T7Z 0E6 <br /> TOTAL BID:$568,779.27 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 Mobiliization LS 125,085.98 1.00 1.0000 0.5000 0.5000 . 125,085.98 62,542.99 62,542.99 <br /> 0002 Biosolids Dredging DRYT 69.67 2,000.00 2,073.4300 892.7900 1,180.6400✓ 144,455.87 62,200.68 82,255.19 <br /> 0003 Biosolids Dewatering DRY T 144.32 2,000.00 2,073.4300 892.7900 1,180.6400✓ 299,237.42 128,847.45 170,389,96 <br /> Work Order Totals: 568,779.27 253,591.12 315,188.14 <br /> Co <br /> • <br /> • <br /> • <br /> • <br /> • <br /> � I <br />
The URL can be used to link to this page
Your browser does not support the video tag.