Laserfiche WebLink
Exhibit A - Description of the Changed Work <br />12/23/2002 <br />Tire Station No.6 <br />.Change Order No. 3 <br />No.; Construction Change Proposals <br />Amount <br />5 Wagnatrack to Magnarail, doors to operate fan not vechicles <br />$12,764.91 <br />9a . 'Add: turnout shelving, parapet ladder & replace brackets <br />$ <br />2,738.84 <br />10 !Add: additional gravel parking at northwest corner <br />$ <br />2,600.56 <br />11 Add: concrete apron to west side <br />$ <br />2,069.08 <br />Total!I $20,173.39 <br />No. lConstruction Change Directives <br />Amount_ <br />4 !Add: driveway trench drain <br />$ <br />3,049.80 <br />7 !Add: 2 doors to Officer 106 & 107 <br />$ <br />1,210.35 <br />11 Add: 2 electrical outlets at pull-down bed locations <br />$ <br />382.10 <br />12 Add: sound insulation to Aid Office walls <br />$ <br />172.12 <br />13 !Add: relocate 7 existing electrical conduits at north apparatus bay <br />267.70 <br />15 Add: one outlet & one data outlet to Aid Office 104 <br />388.96 <br />16 IAdd: 3 additonal speaker locations at Apparatus Bay 108 <br />$ <br />1,330.47 <br />20 'Add. lobby skylight & ceiling <br />T <br />2,070.53 <br />21 IAdd: southern irrigation controller <br />125.84 <br />22 !Add: repair & reconnect broken irrigation lines <br />1,174.32 <br />23 Add: access hatch from hose tower to root <br />717.60 <br />26 !Add.- one 20 amp circuit for southwest cord drop <br />378.66 <br />h reels <br />27 "Add: two air hose at north apparatus bay <br />$ <br />3,624.19 <br />28 'Add: remove brush from west parking lot <br />$ <br />179.40 <br />29 iKd_­d­.-relocate _Ian_dscape & irrigation & add asphalt & curb at back door $ <br />514.80 <br />30 'Add: relace existing irrigation controller with a new controller <br />i $ <br />371.80 <br />31 Add: two j boxes and conduit for drop down speaker locations <br />376.38 <br />32 Add: two appleton cord reels <br />$ <br />2,210.21 <br />33 ;Add: revise kitchen outlets to not shut off with an alarm <br />$ <br />144.14 <br />34 ;Add: revise exhaust system controls <br />$ <br />1,614.18 <br />35 Add: remove excess dirt at east apron <br />1,163-05 <br />36 Add: natural gas trench <br />1,244.56 <br />37 !Add: demo excess concrete at northeast & northwest corners <br />1,794.00 <br />38 IAdd: repair damaged floor at fire pole <br />$ <br />411.73 <br />__39 j Delete: west apron asphalt Add: west apron concrete <br />$ <br />2,823.52 <br />40 !Add: weld bolts at metal shear frames <br />418-60 <br />41 !Add: plywood backing at metal shear frames <br />$ <br />956.80 <br />42 1 Credit for overhead door repair <br />38 0.13 <br />-4-3 IAdd: light fixture revisions to dayroom, kitchen, hallway <br />1,855.57 <br />44 ;Add: gfi outlet at old apparatus work bench <br />_343-26- <br />45 IAdd: one gamwell light to each officer room <br />$ <br />704.70 <br />46 ;Add: replace one light fixture due to water damage <br />$ <br />93.81 <br />47 IAdd: 9 mini blinds at existing windows <br />$ <br />1,734.50 <br />49 'Add: modify kichen cabinet to accommodate 2—ovens <br />43.0.56.. <br />50 Add: Nederman electrical connections_4,171.02 <br />51 Add: relocate Nederman exhaust duct <br />1,478.24 <br />-------------- <br />Total. $39,547.28 <br />Change Order No.3 - Total $ 59,720.67 <br />