My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/01/08 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/01/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 1:49:28 PM
Creation date
1/4/2017 11:07:59 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/8/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br />PROJECT TITLE: Hewitt Avenue Sanitary <br />Sewer Replacement Project: Engineering <br />Agreement Time Extension <br />LOCATION: Hewitt Avenue, Rucker <br />Avenue to Broadway <br />Preceding Action: <br />Council authorized the Mayor to sign <br />original contract, and contract <br />amendments. <br />Attachments: <br />Amendment No. 6 to the Professional <br />Service Agreement for the Hewitt Avenue <br />Sewer Replacement Project <br />Initialed by: <br />Department Head <br />CAA <br />Council President <br />COUNCIL BILL # <br />Originating Department <br />Contact Person <br />Phone Number <br />FOR AGENDA OF <br />Consent <br />X Action <br />First Reading <br />Public Works <br />Mark Sadle <br />257-8967 <br />January 8, 2003 <br />Department(s) Approval (Identify): <br />Public Works <br />Second Reading <br />Third Reading <br />Public Hearing <br />Council approval of this agenda item authorizes a budget revision in the additional amount requested <br />Expenditure Required <br />$0.00 <br />Account Number(s): Fund 401 <br />Amount Budgeted <br />$12,000,000 <br />Additional Required <br />None <br />SUMMARY STATEMENT: <br />The Hewitt Avenue Utilities and Street Project, from Rucker Avenue to Broadway, is nearing full <br />completion. Amendment No. 6 to the engineering contract allows additional time to complete the <br />construction closeout and record drawings. This is a time extension only; no additional costs are necessary to <br />complete the construction engineering. <br />RECOMMENDATION (Exact action requested of Council): <br />Authorize the Mayor to sign Amendment No. 6 to the Professional Service Agreement with Perteet <br />Engineering for the Hewitt Avenue Sewer Replacement Project. <br />cityagenda010803.doc <br />21 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.