My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/01/15 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/01/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 11:22:35 AM
Creation date
1/4/2017 11:22:26 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/15/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Run'Date: 12/19/02 City of Everett-Public Works Department Cutoff Date: 12/31/02 <br /> Time: 8:58 AM Contract Estimate Voucher <br /> Project: 144 For Work Order#2920 Contractor: MT ELECTRIC,INC. <br /> HES SIGNAL IMPROVEMENTS Estimate #6 5911 PRESTON FALL CITY ROAD <br /> WO 2920 BID:$107,439.41 FALL CITY,WA 98024 <br /> TOTAL BID:$373,702.50 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 MOBILIZATION LS 14,193.86 1.00 1.0000 1.0000 0.0000 14,193.86 14,193.86 0.00 <br /> 0002 Maintenance&Protec tion of Traffic Control LS 1,067.15 1.00 1.0000 1.0000 0.0000 1,067.15 1,067.15 0.00 <br /> )003 TRAFFIC CONTROL LABOR HR 30.00 121.96 221.9600 221.9600 0.0000 6,658.80 6,658.80 0.00 <br /> 0005 Construct Traffic Sig.Colby 0 43rd St. LS 84,300.00 1.00 1.0000 1.0000 0.0000 84,300.00 84,300.00 0.00 <br /> 0007 Existing Private Improve ments Restoration FA 1.00 1,219.60 1,219.6000 1,093.2600 126.3400 1,219.60 1,093.26 126.34 <br /> Work Order Totals: 107,439.41 107,313.07 126.34 <br /> Cie.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.