My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2017 8:27:54 AM
Creation date
1/6/2017 8:27:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/15/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Call for Bids for contractors to construct Initialed by: <br /> The Effluent Transfer pump station and pipe lines Department Head <br /> facilities CAA — : <br /> Council President /c7(' <br /> LOCATION: COUNCIL BILL # <br /> Pump Station and cross-town piping project Originating Department Public Works <br /> beginning at the Water Pollution Control Contact Person Tim Marks <br /> Facility and ending near Kimberly Clark on <br /> Phone Number 425-257-8872 <br /> the Everett Water front. FOR AGENDA OF 1-22-03 <br /> Preceding Action: X Consent Second Reading <br /> Council Approval of Professional Action Third Reading <br /> Services Contract to prepare plans and First Public Hearing <br /> specifications Reading <br /> Attachments: <br /> Department(s)Approval(Identify): <br /> Council approval of this agenda item authorizes a budget revision to be prepared in the additional Amount requested <br /> Expenditure Required: $500 Account Number(s): <br /> UT-2880 <br /> Amount Budgeted: $5,500,000 UT-2880 <br /> Additional Required: 0 <br /> SUMMARY STATEMENT: <br /> The City of Everett is require to transport effluent from the WPCF to Kimberly Clark for discharge into Possession <br /> Sound by means of a deep water outfall pipe. The design of the pump station and pipeline necessary to construct <br /> this facility has been complete by CII2M HILL. Utilities is prepared to Call for Bids to obtain the necessary <br /> services of a contactor to construct these facilities. <br /> RECOMMENDATION (Exact action requested of Council: <br /> Authorize a Call for Bids for contractors to construct the Effluent Transfer pump station and pipeline facilities <br /> necessary for the Effluent Transfer Project <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.