Laserfiche WebLink
• J <br /> EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Addendum No. 2 to the CH2M HILL contract for Initialed by: <br /> the design of the Effluent Transfer Project. Department Head Mir <br /> CAA <br /> Council President <br /> LOCATION: <br /> This is a pump station and cross-town piping COUNCIL BILL# <br /> project beginning at the Water Pollution Originating Department Public Works <br /> Control Facility and ending near Kimberly Contact Person Tim Marks <br /> Clark on the Everett Water Front. Phone Number 257-8872 <br /> FOR AGENDA OF 1-22-03 <br /> Preceding Action: <br /> Council approval to sign a Professional Consent Second Reading <br /> Service Contract with CH2M HILL for XX Action Third Reading <br /> design services. 2-6-02 First Reading Public Hearing <br /> Budget Revision <br /> Attachments: Department(s)Approval (Identify): <br /> Addendum No. 2 <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $84,500.00 Account Number(s): UT 2880 <br /> Amount Budgeted $5,500,00.00 UT 2880 <br /> Additional Required None <br /> SUMMARY STATEMENT: <br /> During the design of the Effluent Transfer Project CH2M HILL completed additional scope of work in their <br /> contract. These changes decreased the cost to construct this project. One of the scope changes resulted in a <br /> $1.1 million reduction in the construction estimate for the project. The total cost of the CH2M HILL contract <br /> is as follows: <br /> Original Contract, Predesign $67,904 <br /> Addendum No. 1, Design $789,950 <br /> Addendum No. 2, Scope Change $84,500 <br /> Total $951,354 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Addendum No. 2 to the CH2M HILL contract, increasing the total compensation <br /> by$84,500.00 , for additional design work. <br /> 'CCAMSTR: 1 5 <br />