Laserfiche WebLink
• <br /> 2 <br /> CERTIFICATE OF COMPLETION <br /> Project: East Everett Pedestrian Walkway, Stage 1 <br /> Contractor: Schwetz Construction <br /> Work Order No. PW2696 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> Utilities Director Date <br /> Tom Thetford <br /> Approved by: <br /> Mayor,City of Everett Date <br /> Frank E. Anderson <br />