3 Project: • <br /> Change Order no. <br /> Change Order Effective Date: <br /> Work Order 3088 Wetmore Avenue Portion 1-way to 2-way conversion <br /> Amend or add the following bid items to work order 3088. <br /> Item#4—Traffic Control Labor.Add additional hours of traffic control labor to the contract amount <br /> under work order 3088. <br /> Item#14—Gravel Borrow. Add additional tons of gravel borrow to the contract amount under work <br /> order 3088. <br /> Item#19—Crushed Surfacing Top Course. Add additional tons of crushed surfacing top course to the <br /> contract amount under work order 3088. <br /> Item#24—Solid Wall PVC Storm Drain Pipe,8-Inch Diameter. Add additional linear feet of solid wall <br /> PVC storm drain pipe,8-inch diameter,to the contract amount under work order 3088. <br /> Item#70—Additional Castings For Storm/Sanitary Sewer. Add a new bid item additional castings for <br /> storm/sanitary sewer on a per each basis to work order 3088. <br /> Item#72—Type A Thickened Edge for Sidewalk. Add a new bid item type a thickened edge for <br /> sidewalk on a per linear foot basis to work order 3088. <br /> Work Order 3089 Hoyt Avenue Portion 1-way to 2-way conversion <br /> And the following bid item to work order 3089. <br /> Item#70—Additional Castings For Storm/Sanitary Sewer. Add a bid item additional castings for <br /> storm/sanitary sewer on a per each basis to work order 3088. <br /> B. Justification of the items being amended or added by this change order <br /> Work order 3089A for Hoyt Avenue in front of the post office. Justification:This work is being added at <br /> the direction of the Public Works City Engineer. <br /> Work orders 3088 &3089 modification to bid quantities on existing bid items and addition of new bid <br /> items. <br /> Justification:Additional quantities are being added to bid items 4, 14, 19&24 as the quantities used to <br /> date have exceeded the original estimated quantities. Additional bid items 70&72 are being added to this <br /> contract as the existing casting on the project are old non-standard castings and installation of type A <br /> thickened edge is a City of Everett standard along curb and gutter radius. <br /> All bid item quantities added or amended by this change order are shown on the change order estimate <br /> quantities sheets 1 through 4 of 4. <br /> C. Additional Contract Time <br /> Ten additional working days are being added to the contract time as a result of this change order#1. <br /> Exhibit A <br /> Page 5 of 5 <br />