My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/02/26 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/02/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2017 9:43:00 AM
Creation date
1/6/2017 9:42:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/26/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Amendment No. 1 to Professional Services Initialed by: <br /> Agreement with W.C. Brockway Architects for Department Head <br /> architectural services for remodel of Forest Park CAA <br /> Administration Building Council President /OW <br /> LOCATION: <br /> Forest Park COUNCIL BILL# <br /> 802 E. Mukilteo Boulevard Originating Department Parks <br /> Contact Person Susan Francisco <br /> Phone Number 425-257-8300 <br /> FOR AGENDA OF February 26, 2003 <br /> Preceding Action: Consent Second Reading <br /> Approval of PSA on 10/23/02 X Action Third Reading <br /> Adoption of an ordinance creating a First Reading Public Hearing <br /> special construction fund and authorizing <br /> the design and construction of various <br /> park improvement projects on 5/24/00 <br /> Attachments: Department(s)Approval (Identify): <br /> Amendment No. 1 to PSA Parks,Administration <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $48,066.00 Account Number(s): <br /> Amount Budgeted $ 35,788.00 PK581-1-32-650 (CIP3) <br /> Additional Required $ 12,278.00 PK1021-1-52-650 (Fund 354, AT&T Franchise Funds) <br /> SUMMARY STATEMENT: <br /> In August 2002 the Parks &Recreation Department initiated design development to remodel and expand the <br /> Forest Park Administration Building. The original scope included general repairs, site work and minor <br /> modifications for modest improvements to the EverettTV studio. During the design phase based upon <br /> consultation with television professionals, additional modifications were identified to improve EverettTV studio <br /> functionality, including floor plan revisions,noise reduction measures and additional upgrades to the HVAC and <br /> electrical systems. Site work design is also required to stabilize a failing concrete retaining wall and adjust final <br /> grades for ADA improvements. <br /> The amount budgeted for the Forest Park Administration Building Remodel project is $ 35,788.00. The <br /> modifications and site work design specified in this amendment will require an additional $ 12,278.00, increasing <br /> the total project cost to $ 48,066.00. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 1 to the Professional Services Agreement with William C. <br /> Brockway for architectural services for the design of the Forest Park Administration Building Remodel project <br /> and revising the total project cost to $48,066.00. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.