My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/03/26 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/03/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2017 11:01:30 AM
Creation date
1/6/2017 11:01:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/26/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> 1. Work to Be Performed <br /> Design Phase <br /> • Site Investigation For Removal and Installation of Cooling Tower <br /> • Prepare design and Specification For Demolition and Removal of Existing Cooling Tower <br /> • New Cooling Tower Selection and Placement <br /> • Layout of Roof Equipment <br /> • Compare Existing and New Cooling Tower Weights and Dimension for Use in Existing Location <br /> • Filtration and/or water treatment of cooling tower water <br /> • Cooling tower specification—Mechanical and Limited Electrical <br /> • Design and Specification complete by 3/21/2003 <br /> • Drawings will be prepared using Auto Cad 2000 <br /> • Provide one(1)set of 24"X36"drawings and one(1)Electronic file using CD <br /> • Provide one(I)set of written specifications <br /> • Provide electronic copy of written specification using M/S Word <br /> Construction Phase <br /> • Responses to Regulatory Review <br /> • Responses to Contractor Requests for Information <br /> • Shop Drawing Review <br /> • Site Visits(Two: (1)50-70%and (1) 100%) <br /> • Provide one(I)set of 24"X 36"As Built Construction Drawings <br /> l <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.