Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF WORK <br /> 1. Work to Be Performed <br /> Design Phase <br /> • Site Investigation For Removal and Installation of Cooling Tower <br /> • Prepare design and Specification For Demolition and Removal of Existing Cooling Tower <br /> • New Cooling Tower Selection and Placement <br /> • Layout of Roof Equipment <br /> • Compare Existing and New Cooling Tower Weights and Dimension for Use in Existing Location <br /> • Filtration and/or water treatment of cooling tower water <br /> • Cooling tower specification—Mechanical and Limited Electrical <br /> • Design and Specification complete by 3/21/2003 <br /> • Drawings will be prepared using Auto Cad 2000 <br /> • Provide one(1)set of 24"X36"drawings and one(1)Electronic file using CD <br /> • Provide one(I)set of written specifications <br /> • Provide electronic copy of written specification using M/S Word <br /> Construction Phase <br /> • Responses to Regulatory Review <br /> • Responses to Contractor Requests for Information <br /> • Shop Drawing Review <br /> • Site Visits(Two: (1)50-70%and (1) 100%) <br /> • Provide one(I)set of 24"X 36"As Built Construction Drawings <br /> l <br /> 9 <br />