Laserfiche WebLink
4 • <br /> S. End Interceptor Northern Segment 5.6% <br /> Headworks 3.1% <br /> Sewer Treatment Plant 4.0% <br /> The total cost of each facility to which said percentage shall be applied shall include but not <br /> be limited to engineering costs and fees, all payments to consulting engineers or contractors, <br /> or otherwise, for labor,materials, equipment,overhead,etc.,right-of-way,or land costs, <br /> testing,inspection,legal fees, and interim financing costs.Payments to the City shall <br /> commence with approval by the City of the Engineer's and/or the Contractor's <br /> progress payments for work performed so that payments from the District will coincide <br /> with the City's payments to Engineers/Contractors.Final total costs will be established and <br /> adjusted upon release of all claims against said projects. The District's obligation <br /> to the City shall be junior to all present and future bonded indebtedness of the District. <br /> 7. This Agreement shall be effective as of the date of attestation by the Everett City Clerk. <br /> 8. This Amendment constitutes joint water/sewer facilities planning pursuant to the Growth <br /> Management Act. <br /> 9. Except as otherwise expressly modified by this Amendment,the terms and conditions of the <br /> Agreement, as amended by the 1985 Amendment and 1992 Amendment, remain in full force and <br /> effect. <br /> CITY OF EVERETT Mukilteo Water District <br /> WASHINGTON [Address] P.O. Box 260 Mukilteo, WA 98275 <br /> By: 4��- 4' <br /> By: Typed/Printed Name: William tL Allison_ <br /> Frank E.Anderson,Mayor Position/Office: President <br /> March 12, 2003 <br /> Date Date <br /> APPROVED AS TO FORM:: APPROVED AS TO FORM: <br /> ' <br /> A <br /> Mark T. Soine, City Attorney Michael P. Ruark, Attorney <br /> Date: Date: 2, 7Il/..3 <br /> X `1 <br /> S:\MWelborn MUK1LTEO SEWER\20030214 Amend MWD SEWER AGREEMENT.doc <br />