My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/04/30 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/04/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 9:47:42 AM
Creation date
1/9/2017 9:45:48 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/30/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM COVER SHEET 4 <br /> PROJECT TITLE: Initialed by: <br /> AUTHORIZE CALL FOR BIDS FOR THE EAST Department Head: .amp <br /> EVERETT PEDESTRIAN WALKWAY CAA <br /> PROJECT (STAGE 2) FROM HEWITT AVENUE Council President: <br /> TO 20TH STREET. <br /> LOCATION: <br /> COUNCIL BILL # <br /> Hewitt Avenue to 20`h Street Originating Department Engr./Public S rvices <br /> Contact Person Brian Jones 1; <br /> Phone Number 257-8922 <br /> FOR AGENDA OF: April 30, 2003 <br /> Preceding Action: <br /> X Consent Second Reading <br /> 10-30-02 Council approved Action Third Reading <br /> Ordinance 2656-02 First Reading Public Hearing <br /> Attachments: Department(s) Approval (Identify): <br /> Vicinity Map <br /> Expenditure Required Estimated $211,956.00 Account Number(s): <br /> Amount Budgeted $211,956.00 PW2696 <br /> Additional Required -0- <br /> SUMMARY STATEMENT: <br /> Pedestrian walkway improvements have been designed for Stage 2 of the East Everett pedestrian trail <br /> system from Hewitt Avenue to 20th Street. The construction plans and specifications for these <br /> improvements are complete and the project is ready to be advertised for construction bids. The project <br /> includes the widening and construction of approximately 4,895 lineal feet of concrete sidewalk, curb and <br /> gutters, curb ramps, concrete inlets, and all other appurtenances necessary to complete the project. <br /> The funding sources for this project are as follows: <br /> STP (Federal) $182,282.00 <br /> Fund 301-Arterial Streets 29,674.00 <br /> TOTAL $211,956.00 <br /> RECOMMENDATION: (Exact action requested for Council): <br /> Authorize the call for bids for the East Everett Pedestrian Walkway Improvements (Stage 2), from <br /> Hewitt Avenue to 20th Street. <br /> Bid Call - East Everett Ped. Walkway 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.