Laserfiche WebLink
INSPECTION REPORT <br />��� Date � I I �i � � Permit: � � � I (� —�� � <br />/ i,��� � � � Contractor: '�� ���C 0�� <br />�' , � <br />��,(�� Owner: ��,��..� � �g�.''��� <br />Site Address: �j� � � �' _�-v��-�1t"�Q �j��� <br />ELECTRICAL <br />❑ Temp Service <br />❑ Groundwork <br />❑ Slab/Conduit <br />❑ Rough In <br />❑ Service <br />❑ Grounding <br />rical F� al <br />W <br />❑ Footing drains <br />❑ Roof drains <br />TYPE OF INSPECTION REQUESTED <br />BUILDING MECHANICAL <br />❑ UFER ground ❑ Groundwork/Slab <br />❑ Footing ❑ Rough In <br />❑ Foundation ❑ Ceiling Grid <br />❑ Structural Slab ❑ OK to insulate <br />❑ Framing ❑ Rooftop Units <br />❑ Insulation ❑ Mechanical Final <br />❑ Drywall Nailing <br />❑ Shear Nailing GAS PIPE <br />❑ Roof Nailing ❑ Rough In/Service <br />❑ Ceiling Grid ❑ Refrigeration <br />❑ Building Final ❑ Gas Pipe Final <br />PLUMBING <br />❑ Groundwork/Slab <br />❑ Rough In <br />❑ Ceiling Grid <br />❑ OK to insulate <br />❑ Water Service <br />❑ Medical Gas <br />❑ Plumbing Final <br />Hot Water Tank <br />❑ Rough in <br />❑ HWT Final <br />OTHER OR CONSULTATION: <br />❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE IT <br />❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br />❑ OK FOR C.O. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: • <br />❑ CALL (425) 257-8881 FOR REINSPECTION - 24 hour notice required <br />���-�$L -- � �� �-. <br />Inspector\�� - - _ - _ - Date: _�'- � �- <br />FIR (10/06) <br />D�i�DAR, WC. <br />