Laserfiche WebLink
i <br /> INSPECTION REPORT <br /> Date 1110 I X f1 Permit: Z l lq l\ r ©l5 <br /> Contractor: C, (ice. <br /> 6<10- C UV <br /> Owner: Doc r ovie <br /> kx <br /> Site Address:'2(_‘:, Rai vim- t- - <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> lectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Fin ,0 Gas PipeFinal ❑HWT Final <br /> OTHER OR CONSULTATION: C3t00 UJw l -_C). k <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL TH - - <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: .— <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Qty �.cii1ta-LG•4-- <br /> Inspecto Date: lith <br /> EIR(10/06) DATABAR,INC. <br />