Laserfiche WebLink
�C� t�-[ - f �'3 � l�-P J'� <br />,x. Field Rep. Project No. Page of Repoh No. <br />; i � L�arth S�6u�i��s NW��c AWP 3588 1 of 1 57D <br />'- '� � N ��- 1805 136'" Place NE, FAX: Time On 5ite Time Off Site Date Day of Week <br />Suite 201 (425) 449-4711 <br />Bellevue, WA 98005 TOLL FREE: 12:45 PM 1 PM 01/14/15 Wed. <br />(425) 449-4704 (866) 366-8710 <br />DAILY FIELD REPORT TravelTime Weather <br />1.0 hr Sunny, 40 °F <br />Project Name � � Job Location <br />Silver Lake 211 D 110�h St. SE, Everett, WA <br />General Contractor General Contractor's Superintendent <br />Grading Contractor Grading Foreman <br />BDZ Dale <br />Are approved Plans/Pemiits onsite � YES � NO Project No. <br />Client / Owner <br />Polygon NW <br />Received Onsite By <br />Checked By � <br />�1�5 <br />Permit No. <br />As requested, an ESNW representative conducted a site visit to test earth-work activities. <br />The grading contractor had prepared the lot for Building 3(Apts 7— 11) for footings. This area is a cut. The full <br />extent was probed with a 1/2" t-probe every approximately 5' using full body weight. The area was found to be firm <br />and dense, suitable for the intended strucfures. <br />An ESNW representative will return as requested to observe and/or test earth-work activities. <br />, — " %,. <br />Aaron Parker <br />COPY TO: <br />CONTINUED ON NEXT PAGE � <br />� <br />