Laserfiche WebLink
April 21, 2016 <br />ES-3588.01 <br />Polygon Northwest <br />PO Box 1349 <br />Believue, Washington 98009 <br />Attention: Ms. Michelle Dittman <br />� 2.: <br />Earfh <br />Solutions <br />NW«� <br />Earth Solutions NW ��C <br />• Geot�:c:hnicai Er�hineerir�s; <br />° Constru�::tion Mion':f�nring <br />• f..nvirornrrenta) Scie3�<;es <br />Subject: Final Report — Building 1 <br />Construction Monitoring and Consulting Services <br />Silver Lake Center <br />2020, 2022, 2024, 2026, 2028 & 2Q30 — 113th Place Southeast <br />Everett, Washington <br />City of Everett Permits C'1411-042, C1411-043, C1411-044, C1411-045, <br />�'� �11-�J�6, � C'� �1'! m0�7 <br />Dear Ms. Dittman° <br />In accordance with your request, Earth Solutions NW, LLC (ESNW) provided construction <br />monitoring and consulting services at the subject site. Our services included providing onsite <br />observations and testing on a part-time from October 16, 2015 to December 2, 2015. Our <br />representatives made three site visits to observe and confirm the building foundation subgrade. <br />Our representative observed building foundation subgrade to be dense and suitable for support <br />of the proposed structure. <br />Based on our observations and testing, the earthwork construction was accomplished in <br />accordance with the project plans and our geotechnical recommendations. <br />1�3t), - 1:3Gth Place N.E., Suit�e 2U7 •(3e�llevue, 11�.A 9F3b05 •(425) 449-47(14 • FAX i425? �149-4?11 <br />