Laserfiche WebLink
April 21, 2016 <br />ES-3588.01 <br />Polygon Northwest <br />PO Box 1349 <br />Bellevue, Washington 98009 <br />Attention: Ms. Michelle Dittman <br />. Earth ? <br />Solutions' <br />NW«< <br />�..� <br />Earth Solutions NW ��c <br />• Gec�techni�al Fngineerin2 <br />° (:c;nstrucl:ic�n klc,nitc,rioig- <br />• F.nvironm�rital Scie��c.es <br />Subject: Finai Report— Building 1 <br />Construction Monitoring and Consuiting Services <br />Siiver Lake Center <br />2020, 2022, 2024, 2026, 2028 & 2030 —173th Place Southeast <br />Everett, Washington <br />City of Everett Permits C1411-042, C'I411-043, C1411-044, C1411-045, <br />G'! �'9'� -��6, � C'� �4'! 1 p��� <br />Dear Ms. Dittman: <br />In accordance with your request, Earth Solutions NW, LLC (ESNW) provided construction <br />monitoring and consulting services at the subject site. �ur services included providing onsite <br />observations and testing on a part-time from October 16, 2015 to December 2, 2015. Our <br />representatives made three site visits to observe and confirm the building foundation subgrade. <br />Our representative observed building foundation subgrade to be dense and suitable for supporfi <br />of the proposed structure. <br />Based on our observations and testing, the earthwork construction was accomplished in <br />accordance with the project plans and our geotechnical recommendations. <br />1t�U:i - 13fith Place N.E., Suite 2G1 • Qell��vue, VVA �3i3t7(i5 •{475) 4�i9-4704 • FAX 142�) 449-4?11 <br />s <br />� <br />