Laserfiche WebLink
Apri( 21, 2016 <br />ES-3588.01 <br />Polygon Northwest <br />PO Box 1349 <br />Bellevue, Washington 98009 <br />Attention: Ms. Michelle Dittman <br />Earth m <br />Solutions <br />fUW«< <br />Earth Solutions NW ��c <br />• Ge<�technicai Fn ;ineerin� <br />" Construc:tion Monitorin� <br />• Emironrr�enta) Sciences <br />Subject: Final Report — Building 1 <br />Construction Monitoring and Consulting Services <br />Silver Lake Center <br />2020, 2022, 2024, 2026, 2028 & 2030 —113th Place Southeast <br />Everett, Washington <br />City of Everett Permits C1411-042, C'1411-043, C1411-044, C1411-045, <br />�� �'� � �tJ�C, � i�141 � tl0��� <br />Dear Ms. Dittman: <br />In accordance with your request, Earth Solutions NW, LLC (ESNW) provided construction <br />monitoring and consulting services at the subject site. Our services included providing onsite <br />observations and testing on a part-time from October 16, 2015 to December 2, 2015. Our <br />representatives made three site visits to observe and confirm the buiiding foundation subgrade. <br />Our representative observed building foundation subgrade to be dense and suitable for support <br />of the propased structure. <br />Based on our observations and testing, the earthwork construction was accomplished in <br />accordance with the project plans and our geotechnical recommendations. <br />1i305 - 136Ch Place N.E, Suite 2U1 ° QeIIF:vt�e, VVA 9F3i)05 •('125) 449 4704 ° FAx (42�) 4=�9-4?11 <br />