My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2030 113TH PL SE 2017-01-13
>
Address Records
>
113TH PL SE
>
2030
>
2030 113TH PL SE 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 11:09:44 PM
Creation date
1/10/2017 3:34:28 PM
Metadata
Fields
Template:
Address Document
Street Name
113TH PL SE
Street Number
2030
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apri! 21, 2016 <br />ES-3588.01 <br />Polygon Narthwest <br />PO Box 1349 <br />Bellevue, Washington 98009 <br />Attention: Ms. Michelle Dittman <br />n <br />Ear#h <br />5olutions <br />NW«< <br />Earth Solutions NW ��c <br />• Geotechnicai Fn;ineerin;; <br />° Ccinstruci:ic,n tilt.mit[,rin� <br />• Fnvironmental Scies7ces <br />Subject: Final Report — Building 1 <br />Construction Monitoring and Consulting Services <br />Silver Lake Center <br />2020, 2022, 2024, 2026, 2028 & 2030 — 113th Place Southeast <br />Everett, Washington <br />City of Everett Permits C'1411-042, C1411-043, C1411-044, C1411-045, <br />�'!�4'!'4-��6, & �1�1'l�0�7 <br />Dear Ms. Dittman: <br />' In accordance with your request, Earth Solutions NW, LLC (ESNW) provided construction <br />monitoring and consulting services at the subject site. Our services included providing onsite <br />observations and testing on a part-time from October 16, 2015 to December 2, 2015. Our <br />' representatives made three site visits to observe and confirm the building foundation subgrade. <br />Our representative observed building foundation subgrade to be dense and suitable for support <br />of the propased structure. <br />Based on our observations and testing, the earthwark construction was accomplished in <br />accordance with the project plans and our geotechnical recommendations. <br />1t3Q5 - 136�h P1ace N.E., Suife 2C)S °[3ellevi�e, b1lA 9t3i105 •(41_5) ��i4 47n4 • FAX (42�? 449-4?11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.