Laserfiche WebLink
2s� � z. (� 3�"` f� Q�� <br />Earth Solutions N�VLLC Field Rep Project No. Page of Report No. <br />� i AWP 3588 1 of 1 57D <br />`_ {' j� ��� 1805 136'h Place NE, FAX: Time On Site Time Off Site Date Day of Week <br />Suite 201 (425) 449-4711 <br />Bellevue, WA 98005 TOLL FREE: 12:45 PM 1 PM 01/14/15 Wed. <br />(425) 449-4704 (866) 366-8710 <br />DAILY FIELD REPORT T�a�e�T�`r'e Weather <br />1.0 hr Sunny, 40 °F <br />Project Name � Job Location <br />Silver Lake 2110 110th St. SE, Everett, WA <br />General Contractor � General Contractor's SuperintendentT <br />Grading Contractor Grading Foreman <br />BDZ Dale <br />Are approved Plans/Pemiits onsite � YES � NO Project No. <br />Client / Owner <br />Polygon NW <br />Received Onsite By <br />Checked By � <br />�1►s <br />Permit No. <br />As requested, an ESNW representative conducted a site visit to test earth-work activities. <br />The grading contractor had prepared the lot for Building 3(Apts 7– 11) for footings. This area is a cut. The full <br />extent was probed with a 1/2" t-probe every approximately 5' using full body weight. The area was found to be firm <br />and dense, suitable for the intended structures. <br />An ESNW representative will return as requested to observe and/or test ear�h-work activities. <br />Aaron Parker <br />COPY TO: <br />_– -- — -_ –_ __ - <br />�Z <br />CONTINUED ON NEXT PAGE � <br />