My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2318 BAKER AVE 2017-01-13
>
Address Records
>
BAKER AVE
>
2318
>
2318 BAKER AVE 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 11:14:22 PM
Creation date
1/12/2017 7:56:43 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2318
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C�ty� of �v�rett Public� �orl�s� <br />E/' <br />October 6, 2016 <br />MCKNIGHT JEREMY & TRACY <br />977 SANDY POiINT RD <br />LANGLEY, WA 98260 <br />3200 Cedar St, Everett, WA 98201 <br />Permit Services: (425)257-8810 <br />EXPIRED PERMIT NO. CW1506-004 <br />SITE ADDRESS: 2318 BAKER AVE <br />DESCRIPTION OF WORK: SFR REMODEL <br />EXPIRATION DATE: 02/17/2016 <br />Work under thi:� expired permit is no longer authorized. <br />Sections 105.5 and R105.5 of the International Building Code and International Residential Code <br />state that permits become invalid if the work is not commenced or is suspended or abandoned for <br />more than 180 days. If work has been completed, you may request final inspection within 14 days of <br />the mailing date of this letter. After that time the permit file will be sent to records storage. <br />To request inspection, call (425) 257-8881 OR schedule on-line at: <br />https://everettwa.gov/FormCenter/PublicWorks-5/Inspection-RequestPermit-Services-123 <br />before 4 p.m. for next day inspection. <br />If at some time in the future you decide to continue with this work you will need to apply for a new <br />permit. <br />If you would like to discuss the status of the permit, contact our Permit Technicians at (425) <br />257-8810. <br />Inspection Record: <br />7/ 13/ 15 <br />7/15/15 <br />Footing PartialApproval See notes <br />Partial approval - temp footings to support foundation. Skip section to stabilize Bldg, west, nortj & south <br />side only, as per plans. OK for concrete. <br />Footing Approval <br />Skip footing at existing walls <br />7/17/15 Footing PartialApproval See notes <br />East & 1Nest ends only for footings & foundation walls. <br />Approved as noted: Contractor to excavate footings, no barrier point (north side by door), then OK to <br />pour concrete. <br />7/22/15 Footing Approval <br />As per plans, OK for concrete <br />7/27/15 <br />7/28/15 <br />Balance of foundations, see notes <br />Underfloor PartialApproval See notes <br />Framing for underfloor, OK to install sheating only. <br />Note: need letter from Architect/Eningeer re shear schedule LTP4 locations, sheat nailing. <br />ShearNailing Approval See notes <br />Shear nailing approved as per revised engineering design for shear schedule, LTP4 plate connection. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.