My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1822 CHESTNUT ST 2017-01-13
>
Address Records
>
CHESTNUT ST
>
1822
>
1822 CHESTNUT ST 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 11:18:56 PM
Creation date
1/12/2017 8:31:34 AM
Metadata
Fields
Template:
Address Document
Street Name
CHESTNUT ST
Street Number
1822
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10: Control DeWatering <br />DeWatering may be necessary for this project. However, the existing vegetation retained <br />on site would be available to spread any water from construction for filtration and disposal. <br />11: Maintain BMPs <br />The construction supervisor will be responsible for maintaining all BMPs during <br />construction and working with the City to relocate or add BMPs as necessary as site <br />conditions change. BMPs should be inspected and maintained as needed after every rain <br />event producing more than %4" of rain in a 24-hour period. Also, BMPs shall be inspected <br />on a weekly basis even if site work is not occurring. <br />12: Manage the Project <br />It will be the responsibility of the Contractor and Developer to manage this project and <br />coordinate with the City Inspector and Engineer. <br />Inspection and Monitoring: <br />Site inspections shall be done by a person who is knowledgeable in the principles and <br />practices of erosion and sediment control. The person must have skills to first assess the <br />site conditions and construction activities that could impact the quality of stormwater, and <br />second assess the effectiveness of erosion and sediment control measures used to <br />control the quality of stormwater discharges. <br />Whenever inspection and/or monitoring reveals that the BMPs identified in the <br />Construction SWPPP are inadequate, due to the actual discharge of or potential to <br />discharge a significant amount of any pollutant, appropriate BMPs or design changes shall <br />be implemented as soon as possible. <br />Maintaining an Updated Construction SWPPP: <br />The construction SWPPP shall be retained on-site or within reasonable access to the <br />combined site. The SWPPP shall be modified whenever there is a change in the design, <br />construction, operation, or maintenance at the construction site that has, or could have, a <br />significant effect on the discharge of pollutants to waters of the state. <br />The SWPPP shall be modified if, during inspections or investigations conducted by the <br />owner/operator, or the applicable local or state regulatory authority, it is determined that <br />the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater <br />discharges from the site. The SWPPP shall be modified as necessary to include <br />additional or modified BMPs designed to correct problems identified. Revisions to the <br />SWPPP shall be completed within seven days following inspection. <br />Haack Chestnut SFR 15-0118 <br />October 2015 Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.