Laserfiche WebLink
LEFT 51DE ELEYA�TION <br />1/8�,_ ��_��� <br />� v J � <br />;/ ���, <br />��� �� <br />L�� � � <br />\� �� <br />� y <br />� �� ,. � <br />�� �%� � �� <br />i <br />�(,�. <br />�1 <br />� <br />the owner's and builder'S respon5ibility to confirm all <br />RIGF+T 51DE ELEYATION <br />1/8"= 1'-0" <br />RCC'GONST. <br />' A.'HA��_T SHINGLE ROOFING o/ <br />' 15:.�UILDINGPAF_Rol <br />• 1116 0.5.8. SHEATHING o/ <br />' MP�NUF ROOF TRU55E5 @ 24" O.G. <br />' V1" GYrSUM YJALL BOARD <br />GOFZNER BD <br />8'••1' TYP. PLATE FfE16HT5 <br />82-5/8" TYP_ 6TTM oF FlEADER FFEIGHT <br />WR���P PO5T5 <br />�p; � PLANK SIDING PER BUILDER SFEGS <br />�RONT ELEYATION <br />1/4"= 1'-0" SOME EXTERIDR DOORS NEED TO 5E R415ED �1ND SET <br />is UPON 1!2" PLYWOOD FURRING( DEPENDING O� MFR) TD <br />on <br />ALLOW FOR THROW RUG5 ON THE INSIDE 51'�ING <br />�- ��� C� r�!r�f S�- <br />BAGK ELEYATION <br />va°- i�-0�� <br />G�NERAL NOTES <br />1.GONSTRUGTION TO GOMPLY WITH THE 2012 IRG, 2012 IBG, 2012 <br />IMG, 2012 UPG, 2012 NFG, 2012 NEG, 2012 IFG, 2012 IEGG. 2072 WSEG <br />2. WHERE GONSTRUGTIDN DETAILS ARE NOT SHOWN OR NOTED, THE <br />PROGEDURE 5HALL 8E PREFORMED TO STANDARD GONSTRUGTION <br />PRAGTIGES. � <br />3. THE GONTRAGTOR SHALL VERIhY ALL DOOR & WINPOW F20UGH OPENING <br />DIMEN510N5 WITH MANUPAGTURER PRIDR TO GON5TRUGTION. <br />4. ALL FRAMING ANGHORS, HOLDOWN5, 8 SHEARiNhLLS SHALL 6E <br />INSPEGTED FRIOR TO GOYERING. <br />5. ALL GLAZING TO GOMPLY WITH WSEG 2012. <br />b. WIN�OWS SHALL BE INSTALLED AND FLASNED IN AGGORDANGE <br />WIT}i THE MANUFAGTURER'S WRITTEN INSTALLATION �NSTRUGTIONS. <br />WRITTEN INSTALLATIDN INSTRUGTIONS SHALL BE PROYIpED 8Y THE <br />MANUFAGTURER FOR EAGH WINDONL <br />7. GAULK OR WEATHER-STRIP ALL JOINTS AND PENETRATIONS TO <br />HEATING SPAGES. <br />8. APPROVED NUMBER5 (ADDRE55) SHALL BE PROVIDED IN A <br />POSITION TO BE PLAINLY VISIBLE AND LEGI6LE FROM THE STREET <br />OR ROAD FRONTING THE PROPER7Y. THESE NUMBERS SHALL GONTRAST <br />WITH THcIR BAGKGROUND. AND SHALL 8E A MINIMUM OF 4 INGHES. <br />9. EGRE55 DOORS SHALL BE READILY OPENABLE WITHDUT THE USE <br />OF AKEY OR SPEGIAL KNOWLEDGE OR EFFORT. <br />10. OUTDOOR LIGHTIN6 PER WSEG 2012 505.3 <br />11. EXTERIOR STAIRINAYS AND LANDINGS MUST BE LIGHTED PER 2012 IRG <br />303.6 <br />12. A PRESSURE REGULATOR, PREGEDED 8Y A STRAINER SHALL BE <br />READILY AGG2551BLE. AN� WILL 8E REQUIRED ON THE WFTER <br />SUPPLY TO TNE HOUSE. THIS DEVIGE SHALL BE LOGATED IN THE <br />6ARAGE WITH THE BUILDING SHUT OFF VALVE FOR THE WATER PER <br />�012 UPG 608.2. <br />13. PROVIDE AN ADEQUATELY SIZED EXPANSION TANK AT TFfE HOT <br />Y�WTER TANK AS REQUIRED FER 2012 UPG 608.3. <br />74. iNATER PRESSURE-A050R81NG DEVIGES SHALL BE INSTALLED AS <br />GL05E A5 POSSIBLE TO ALL QUIGK-AGTING YAWE5 [HAMMER <br />ARRESTOR5,5HOGKARRESTORS](GLOTNESiNA5HER5, <br />DISHV�WSHERS, IGE MAKERS ETG.) PER 2012 UPG 609.10. <br />15. ALL HOT AND GOLD YJ,4TER PIPING INSTALLED IN UNGONDITIONcD <br />SPAGES 5HALL BE INSULATED TO R3 MINIMUM PER 2012 UPG <br />SEGTION 313.b. <br />16. LOTS SHALL 6E GRA�ED 50 AS TD DRAIN SURFAGE NWTER <br />Al^!AY FROM FOUNDATION iNALLS. THE GRADE SH,4LL FALL A MINIMUM <br />OF b INGHES WITHIN THE FIRST 10 FEET. (SEGTION R401.9) <br />SHEETINDEX <br />7- ELEVATIONS <br />2- FOUNDATION PLAN <br />3- MAIN FLODR PLAN <br />4- UPPER FLOOR FRAMIN6 <br />5- UPPER FLOOR PLAh <br />b- ROOF FRAMING <br />7. SEGTIONS, WINAOWS 8 FURNAGE 51ZING <br />8. GENERAL NOTES, ENERGY GODE GOMPLIANGE <br />D-7- GONST. DETAILS <br />ELEYATIONS <br />AS NOTED <br />AREAS <br />LOWER FLOOR ' 919 s. ft. <br />UPPER FLOOR �912 s . ft. <br />GARAGE 464 s . ft. <br />F. GOVERED PORGH 140 s. R. <br />GOYERED PATIOS 100 s. ft. <br />LIYING AREA: 1831 5. f. <br />HAACK BROTHERS 1831 ALLEY <br />HOMES <br />ROEERTPETERMEYER ISSl1ED 02'2'2014 R.P. C,H� <br />�R4FTINu 8 �ESIGN SERVILE Revised <br />475.�31 rcbeM1@tlmberuaRus � <br />�'mc� C��� ��� <br />