Laserfiche WebLink
���� �� ������� <br />Building Division <br />Area and Fee Calculation <br />�lame f�l/ �L�-✓�� ���P. 1�� I�lan Gheck �/�o�-c�� <br />Livin �rea <br />Main Floar �047 SQ. FT. @$113 / S.F. <br />Upper Floor l�Z� SQ. FT. @$113 / S.F. / 3g <br />Lower Flo�or <br />Unfinished <br />Total Conditioned Space <br />Accessorv Structures <br />SQ. FT. @ $113 / S.F. <br />SQ. FT. @ $15 / S.F. <br />�2�73 <br />Garage ��Z SQ. FT. @$45 / S.F. Zo, 7�C� <br />Larp�rc <br />���i�TTai <br />Decks <br />:��. r Y . (c.v �30 / �.i�. <br />SQ. FT. @ $ / S. F. <br />Covered � o� SQ. FT. @$30 / S. F. L o <br />Not Coverzd SQ. FT. @$25 / S.F. <br />TOTAL = $ 2�� is � <br />