Laserfiche WebLink
0 <br />,`'�_ <br />E � - F�� <br />JULY 29, 2016 <br />10/22/14 Consultation <br />�,���� �� � �` -�����, ����._�'� ����:���.� - <br />� _ ��. <br />3200 Cedar St, Everett, WA 98201 <br />Permit Services: (425)257-8810 <br />consult re remodeling <br />11/14/14 PlbgGrWork PartialApproval See notes <br />Basement bathroom and sink - groundwork OK to cover. <br />Note: Wrap all pipes that come in contact with concrete. <br />Test system before backfill. <br />12/4/14 PlbgRoughln PartialApproval OK plumbing rough for basement <br />12/8/14 MechRoughln Corr Reqd See notes <br />1) Plumbing note: Studor vent for basement laundry must be open to air. Can not be enclosed in the <br />wall. <br />2) Gas flex at kitchen fireplace �1�ust be sleev2d where ii penetrat�s thc fireplace housing. <br />3) Bath exhaust must be 3' from any opening into the house. <br />4) Outside air must be 10' from any exhaust. <br />5) If range hood is over 400 cfm, you must provide make up air. <br />Note: Corrections are in the attic, OK to proceed with framing and wall cover. <br />12/8/14 <br />12/11/14 <br />Framing Corr Reqd See notes <br />Framing corrections: <br />1) Nail bottom plates shear nailing, galvanized nails - interior foyer. <br />2) Post/beam connections - need to have positive connections - seismic straps & pocket blocking. <br />3) Complete air seal. <br />MechRoughin Approval See notes <br />Mech rough OK as noted: Duct pressure test report at Final <br />12/11/14 Framing Approval See notes <br />Framing OK to cover (insulate). Note: Provide a copy of Insulation Certificate at Final. <br />12/17/14 PlbgGrWork Approval Outside connection of sewer OK to cover <br />12/22/14 InsulBldg PartialApproval See notes <br />Note: Contractor to provide a copy of insulation installed letter <br />Floor R-Value <br />Walis R-Value <br />Ceiling_R- Value <br />AT FINAL <br />12/30/14 ShearNailing Approval See notes <br />Shear nailing - main floor entry, rec area, upper floor - as per plans, OK to cover. <br />9/3/15 Permit Extension Approval extended expiration <br />10/2/15 Final Bldg <br />10/15/15 Final Mech <br />10/15/15 GasPipeFinal <br />Unable to inspect, not ready <br />Page 3 of 4 <br />