My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5107 SOUND AVE 2017-01-14
>
Address Records
>
SOUND AVE
>
5107
>
5107 SOUND AVE 2017-01-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2017 12:07:08 AM
Creation date
1/13/2017 7:24:40 AM
Metadata
Fields
Template:
Address Document
Street Name
SOUND AVE
Street Number
5107
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3uly 21, 2014 <br />Two Single-�amily residences <br />L&A Job Na. 14-065 <br />Page 11 <br />exceeding 4 feet high after stripping of surficial unsuitable soils and prior to placing <br />structural fill. The slope of permanent fill embankments should be no steeper than 2- <br />lI4H:1V. Upon completion, the sloping face of permanent fill embankments shoul.d be <br />thorougl�ly compacted to a non-yielding state vsrith a hoe-pack. <br />The abov� recommended cut and f ll slopes are under the assumption that groundwater <br />seepage would not be encountered during construction. If groundr�vater is encountered, <br />the construction work should be immediately halted and the slope stability re-evaluated. <br />The slopes may have to be flattened and other measures taken to stabilize the slopes. <br />�, �,.,;,�� ;,�t n�r�,.3TA� t�, fln�,� �,n�ontroll�d over cut and fill slopes. Permanent <br />� .�, �i_9 °� „a_ >, _. . <br />cut slopes and fill emba�nienis sriould i��; seec�ed a��� veg��ai�d �s s�o� �s p�ssibl� fo� <br />erosion protectiom and long-term stabiliry, and should be covered with clear plastic sheets, <br />as required, to protect them from erosion until the vegetation is fully established. <br />STRUCTURAL FILL <br />Structural fill is the fill that supports structural or traffic 1oad. Structural fill should <br />cc�nsist of c:lean gra.nular soils free of organic, debris and other deleterious substances and <br />with pari:icles not larger than three inches. Structural fill should have a moisture content <br />within one percent of its optunwn moisture content at the time of placement. The <br />optimu�n moisture content is the water content in the soils that enable the soils to be <br />compacted to the highest dry density for a given compaction effort. Onsite clean soils <br />meeting the above requireinents may be used as structural fill. Imported material to be <br />used as st�ctural fill shauld be clean, free-draining, granular soils containing z�o more <br />LILT & t�SSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.