My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5107 SOUND AVE 2017-01-14
>
Address Records
>
SOUND AVE
>
5107
>
5107 SOUND AVE 2017-01-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2017 12:07:08 AM
Creation date
1/13/2017 7:24:40 AM
Metadata
Fields
Template:
Address Document
Street Name
SOUND AVE
Street Number
5107
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ju]y 21, 201� <br />Two Single-Family residences <br />L&A Job I'�To. 14-065 <br />Page 20 <br />B�ailding Footing Drains <br />A subdrain shauld be installed, around the perimeter footings of each proposed building. <br />The subdrauis should consist of a 4-inch-minimum-diameter, perforated, rigid, drain pipe, <br />laid a few inches below bottom of the perimeter footings of the buildin.gs. The trenches <br />and the dra'vl lines should have a sufficient gradient (0.5% muumum) to generate fiow by <br />gravity. The drain lines should be wrapped in a nan-woven filter fabric sock and <br />completely enclosed in clean washed gravel. The re�naining trenches may be backfilled <br />with clean onsite soils. Water collected by the perimeter footing subdrain systems should <br />be tightlined, separatel}� from the roof and sur�ace stormwater drain lines, to discharge <br />it;`� ��,'r,-,.'� �Pi�'�?' �r �,,;t;��,1P sto�nwat�� ci�snosat fa�ilitieS. <br />Surface Drainage <br />Water should not be allowed to stand in any areas where footings, on-grade slabs, or <br />pavement is to be constructed. Finish ground surface should be graded to direct surface <br />runoff away irom proposed buildings. We recommend the finish ground be sloped at a <br />gradient of 3 percent minimum for a distance of at least 10 feet away from the buildings, <br />except in the areas to be paved. <br />Cleanouts <br />Sufficient number of cleanouts at strategic location� should be provided for underground <br />drain lines. The underground drain ]ines should be cleaned and maintained periodically <br />to prevent clogging. <br />LIU & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.