My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10006 13TH AVE SE 2017-01-13
>
Address Records
>
13TH AVE SE
>
10006
>
10006 13TH AVE SE 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 9:26:02 AM
Creation date
1/13/2017 9:25:53 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH AVE SE
Street Number
10006
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Duct testing Calculator (New Construction j <br /> At Rough-in (Total Leakage) • � <br /> 0 <br /> CFA of 1 Calculated Test� Q <br /> Home Standard Target CFM25 O <br /> a <br /> � <br /> Air Handler Present _< 6 CFM25 per 100 sf of CFA � <br /> 4- <br /> Air Handler not Present _< 4 CFM25 per 100 sf of CFA � <br /> � <br /> O <br /> � <br /> Post Construction �' <br /> a� <br /> v <br /> CFA of 1 Calculated Test2 w <br /> Home Standard Target CFM25 � <br /> 0 <br /> � <br /> Air Handler Present � ��, � g CFM25 per 100 sf of CFA 2 '�? 'Z � <br /> (Total Leakage) � � � <br /> � <br /> Air Handler Present � � <br /> < 6 CFM25 per 100 sf of CFA ' �'-� ���� � <br /> (Leakage to Exterior) �, � <br /> � <br /> � <br /> Air Handler not Present <_ 4 CFM25 per 100 sf of CFA � <br /> � <br /> 1. Test results must comply with one of the Standards options. � <br /> �2. Test CFfV125 must be equal to or less than the calculated target. ~ <br /> Air Leakage testing Calculator (Blower poor Test) <br /> ' Standard CFA of Tested CFM50 Test Result <br /> Home <br /> ..o;0.00030 S LA <br /> �(CFMSoX 0.055)/(CFA X 1�4)� - <br /> Glossary <br /> r'�-��� �-��-.��%�%��' 1 `'� `�` <br /> Rough-In: After installation of the complete air distribution system but before installation of insulation and sheet <br /> rock. Allows for access to all duct seams and connections for re-evaluation of seal integrity it�tandard is not met in <br /> intitial test. <br /> Post Construction: At or near final inspection. The home must be complete enough to pressurize the horrie to 25 <br /> pa. <br /> Total Leakage: Aggreg�tion of the entire systems duct leakage in a dGct test. <br /> Leakage to Exterior: Ag�regation of all duct system leaks to the exterior of the CFA in a duct test. <br /> CFA: Conditioned floor area <br /> CFM2S: Cubic feet per minute of air leakage at 25 pascals of pressure <br /> CFMso: Cubic feet per minute of air leakage at 50 pascals of pressure <br /> Pascal (pa): Unit of pressure / � � �i <br /> SLA: Specific leakage area L� � � _�-� <br /> i �'�'�'C� �..� ���'� ��� <br />
The URL can be used to link to this page
Your browser does not support the video tag.