Laserfiche WebLink
EXHIBIT C <br /> City of Everett <br /> WPCF Schedule A Expansion Project <br /> August 8,2003 <br /> Version 6 <br /> Other Direct Costs-Cost Summary <br /> Zg3k T�Jg ODC <br /> 501 Upgrade Existing Base Mapping and As-Built Drawing. $4,481 <br /> 502 Geotechnical Investigations $0 <br /> 511 Civil Design $12,808 <br /> 512 Architectural Design $7,350 <br /> 513 Structural Design $11,855 <br /> 514 Mechanical Design $28,143 <br /> 515 Electrical Design $15,812 <br /> 516 Instrumentation and Controls Design $10,468 <br /> 520 Permitting AssIstance $1,870 <br /> 530 Schedule $1,070 <br /> 540 Duality Control and Assurance $5,894 <br /> 550 Document Preparation and Bld Assistance $1,670 <br /> 610 Submittal Review $8,857 <br /> 820 Change Order Preparation $6,578 <br /> 630 Miscellaneous Office Engineering $7,870 <br /> 640 On-site Field Services $8,106 <br /> 650 Materials Testing $0 <br /> 880 Operations and Maintenance Manual $2,870 <br /> 670 Startup Services $2,717 <br /> 680 As-Built Documentation $1,253 <br /> 710 Project Management $9,857 <br /> 720 Unanticipated Services $4,195 <br /> Grand Total $147,120 <br /> CSA) <br /> 1 <br />