Laserfiche WebLink
d <br /> EVERETT CITY COUNCIL PRELIMINARY AGENDA <br /> 8:30 A.M. WEDNESDAY, SEPTEMBER 10, 2003 <br /> CITY COUNCIL CHAMBERS <br /> Roll Call <br /> Pledge of Allegiance <br /> Approval of Minutes: September 3, 2003 <br /> Mayor's Comments <br /> Council <br /> City Attorney <br /> Citizen Comments <br /> CONSENT ITEMS (to be adopted by a single motion) <br /> (1) Adopt Resolution # authorizing claims against the City of Everett in the <br /> amount of $2,444,727.11 for the period of August 23, 2003 through August 29, <br /> 2003 <br /> (2) Adopt Resolution # authorizing payroll claims against the City of Everett in <br /> the amount of $2,688,886.99 for the period ending August 23, 2003 <br /> (3) Adopt Resolution # authorizing electronic transfers against the City of Everett <br /> in the amount of $10,096,131.75 for the period of July 1, 2003 through July 31, <br /> 2003 <br /> (4) Award Bid for the Perimeter Landfill Gas Collection System Project for the Everett <br /> Landfill and Tire Fire Site to Glacier Construction Services <br /> (5) Award Bid 2003-601 for Food Service Equipment and Small Wares for Conference <br /> Center operations to the lowest responsive and responsible bidders at their bid <br /> prices including Washington State Sales Tax/Use Tax as designated <br /> ACTION ITEMS (to be considered individually) <br /> (6) Declare listed vehicles and equipment to be surplus and authorize sale at a public <br /> auction to be conducted by James G. Murphy, Inc., Auctioneers <br /> (7) Accept Bid and Award construction contract for the East Everett Pedestrian <br /> Walkway Improvements (Stage II) to Schwetz Construction, Inc., Sedro Woolley, <br /> WA. the lowest responsive and responsible bidder in the amount of $226,841.50 <br /> AGENDA CONTINUED ON BACK OF THIS PAGE <br />