My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12815 19TH AVE SE 2018-01-30
>
Address Records
>
19TH AVE SE
>
12815
>
12815 19TH AVE SE 2018-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2018 11:40:53 AM
Creation date
1/13/2017 10:54:10 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Stormwater Facilities <br /> ❖ In order to avoid having to provide two separate relatively large stormwater <br /> facilities, SC PDS Staff(Randy Sleight/Ken Crossman/120502)has allowed the <br /> designation of a detention swap or equivalent area for the mitigation of increased <br /> peak flows from the Lot 7/South Access area. The Equivalent or Swap Area is <br /> the West Parking Lot. <br /> ❖ Flow Control of increased peak flows from the Northwest Parking Lot(Area A) <br /> &West Parking Lot(Swap Area)will be provided via 370 lineal feet of 96-inch <br /> detention pipe located within the fill prism of the new Northwest Parking Lot. <br /> Over 13,000 cubic feet of live/detention storage is being provided. <br /> ❖ Water Quality Treatment for pollutants generated from the Northwest and West <br /> Parking Lots will be provided via 370 lineal feet of 96-inch detention pipe located <br /> within the fill prism of the new Northwest Parking Lot. Over 5,300 cubic feet of <br /> dead/water quality storage is being provided.. <br /> ❖ Biological Treatment of pollutants generated from the Northwest and West <br /> Parking Lots will be provided via a media filter designed by Stormwater <br /> Management, Inc to treat the 6-month,24-hour design storm. <br /> •3 For Water Quality Treatment of Lot 7/South Access(Area B) and the South <br /> Parking Lot, flows from these areas are being routed via a new conveyance <br /> system to the existing biofiltration swale. <br /> See Hydrologic Calculations in Appendix A and the Preliminary Drainage Plan in <br /> Appendix B. <br /> END SECTION 1 —SITE DRAINAGE NARRATIVE <br /> Targeted Drainage Report for Everett Public Schools Section 2—Risk&Erosion Control <br /> Silver Lake Elementary Parking Lot Expansion January 6,2003 <br /> By: Perteet Engineering Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.