My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/09/17 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/09/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 12:01:00 PM
Creation date
1/13/2017 11:56:43 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/17/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
786
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> CERTIFICATE OF COMPLETION <br /> Project: Sewer Main D Replacement <br /> Contractor: KLB Construction <br /> Work Order No. 3075 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> 2)0k1 Q _ 9-6 ,-zq3 <br /> Utilities Director Date <br /> Tom Thetford <br /> Approved by: <br /> Mayor, City of Everett Date <br /> Frank E. Anderson <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.